- Oct 01, 2012 - Dec 31, 2014
- Budget: EUR 845,543
- EU LIFE is the funder of ReBirth
-
E-mail:
alenka.mauko@zag.si
Project website
ReBirth
The REBIRTH project will have a significant impact on the different domains of construction and demolition waste and industrial waste recycling. It is expected that it will be possible to achieve a permanent increase in the recycling rate for both C&D waste and industrial waste during the duration of the project, i.e. up to 10 % for C&D waste and up to 15 % for inert industrial waste by the end of the project's duration. A turn-around in illegal dump practices, i.e. no further increase in the number of illegal dump sites with C&D waste. It is also expected that the results of the project will ensure a long-term national beneficial effect in the form of a constantly increasing recycling rate, with the main goal of a 70 % recycling rate by 2020. It is expected that approximately 1.5 % of natural materials will be saved as an impact of the project by the end of 2014. This will be displayed through waste to raw material redistribution in industry and construction and demolition activities. Increased awareness will be identifiable through the test answers from training activities and the awareness raising contest in targets groups.
Back